2-year delay in getting rid of corruption
According to Article 31 of the Engineering and Building Control System Law, the responsibility of the project (besides the CEO) is with the natural person of the company. The same statement is repeated in Article 16 of the Executive Regulations. In Article 14 of the executive regulation, there is also talk of the signature of a natural person of the legal company on the map and the monitoring commitment form, which is mentioned in Article 3 of the executive regulation.
The file for issuing licenses to legal entities of the Ministry, which is in the possession of 31 provinces, has sown the seeds of corruption. This file declares the company’s capacity in an aggregate form, while it should be divided by base or building group.
On the other hand, the organization of the construction engineering system of the province does not control the limits of the competence and capacity of the natural person of the design and supervision legal company in most of the provinces.
As a result, people who are aware of this situation bring the level 3 supervision or design engineer’s license to the company, and then use the capacity of this engineer for construction engineering services due to the aforementioned errors.
It is enough that the competence and capacity of the real person of the company is controlled by the provincial organization, this corruption will be eliminated, but the ministry has not announced the same sentence for 2 years.
#Corruption
#Suri_Company
#Law firm
This post is written by AbolfazlTabarzady