Respected directorates of the engineering system organizations of the provinces of the country: Please write to the tax affairs organization of your province and let them know that the basic prices for engineering services such as the separation of mapping and other disciplines of the engineering system, despite the increase in costs, in 1997 has not changed. The expenses of 1997 were double the expenses of 1996. Why should they have to pay more taxes when the licensed members of the engineering system did not have an increase in income during 1997? Please tell me that in provinces like Tehran, the owners sometimes paid between one million to four million tomans and more depending on the area of the building’s foundation for the preparation of the completion plans of the municipalities. However, during 1997, our officials have entrusted the surveying engineers with the free preparation of final maps of the municipalities, and in practice, the surveying engineers in 1997 did not receive a single Rial, instead of only the registration organizations, answerable to both the municipalities and are registration organizations. The responsibilities arising from the preparation of end-of-work maps of municipalities are not small. Issues related to parking lots or municipal disagreements or electronic offices of municipalities and registration organizations. End-of-work defect control is the smallest added responsibility. The cost of printing the maps of each floor six to eight times, and burning the CD at least twice, and the cost of the courier and agency twice. This work should have been done much earlier and announced to the Tax Affairs Organization and included in the circulars of the Tax Affairs Organization. It is not too late. Please report the above issue in writing to the tax affairs organization as soon as possible and let your representative follow up your correspondence in order to reach an agreement and obtain the result. @Madeh_33
This post is written by Archiiiitecture