Honorable Mayor of Tehran Province, Mr. Alireza Zakani

Honorable Mayor of Tehran Province, Mr. Alireza Zakani
Hello
Issue:
Regarding the impossibility of recording the report of the stages (starting construction operations, demolition of the existing building, excavation and foundation) by the architectural supervisor in the system of supervising engineers of Tehran Municipality.
It is respectfully pointed out that according to the articles 22 and 23 of the fifth chapter of the executive regulations of article 33 of the engineering system law, all supervisors and not only the supervisor are obligated to continuously supervise all construction operations and submit reports at all stages. The implementation of the building, including the start of construction operations, demolition of the existing building, excavation and foundation and other steps, and if they encounter a violation during the implementation of the construction steps, they are obliged to report the violation to the building permit issuing authority and the building engineering system organization. .
In the system provided for the purpose of sending stage reports of supervising engineers of Tehran province by the respected municipality of Tehran province, it is possible to register the reports of the stages of construction operations, demolition of the existing building, excavation and foundation only for the coordinating supervising engineer. This is despite the fact that the supervision of all the mentioned steps is within the scope of the competence of architectural supervising engineers who are not introduced as coordinating supervisors, and failure to report these violations in time in these steps causes more serious violations in the next stages of building implementation. and it leads to the condemnation of architectural supervisors according to the mentioned articles of the law. Due to the fact that sometimes the coordinating supervisor registers staged reports with a delay, or does not mention the violations committed, or registers false reports, and due to the independence of the supervisors, it is necessary to independently register the report. Other supervisors should be provided in all stages of the project (including demolition of the existing building, excavation and foundation) according to articles 22 and 23 of the executive regulations of article 33. Therefore, we request you to amend the mentioned system and remove the monopoly of recording the report of the mentioned steps by the coordinating supervisor.
Thanks
A group of architectural supervising engineers of Tehran province