And good time

Hello and have a good time
Be careful
The inspector does not have permission to work in the area of ​​buildings that are under the national building regulations
Even in the technical and executive system, because the supervisor is from the designer’s body and is stationed in the project, he gives orders to the contractor with the powers he has through the design.

Before starting construction operations
The supervisors of 4 fields visited the project site and informed the operator and the owner of the things that are within their scope and their completion is a prerequisite for starting construction operations, including the removal and relocation of water, gas, and electricity branches and telecommunication boxes and their transmission. to a safe place outside the demolition and excavation site, presenting a picture of the employer’s civil liability insurance policies for employees and accidents (insurance policy arising from construction operations) for third parties and adjacent buildings and building quality assurance insurance policy, and finally the coordinating supervisor with confirmation A letter from other supervisors stating that the issuance of the start of construction operations is unimpeded, the permit to start construction operations is issued.

Before starting the construction operations, usually a meeting minutes are prepared between the supervisor and the operator and the owner, which tells the operator and the owner to observe the safety points according to the topics of the national construction regulations and the safety code of construction workshops and to carry out the construction operations according to the approved plans at the time of demolition and Excavation is noted during the construction, and it is not the name of this work, but rather a reminder of the points that are within the scope of the duties of the competent executive, that it is not necessary to organize such a meeting if the presence of the executive is requested.

Therefore, as soon as the construction permit is issued, it is better for supervisors to visit the project and if they observe cases of non-observance of safety points in their field, report the violations to the coordinating supervisor and the coordinating supervisor during the demolition and excavation phase. Aina also reports in the municipality system

This post is written by r_askaripour