The same 4 people from Kermanshah, excluding the others
The function assigned to the Deputy of Urban Development of the General Department of Roads and Urban Development of Kermanshah province with the field of architecture is in the link to the article
https://t.me/Amalgaraa/58
with
The function attributed to the Deputy Civil Engineer of Kermanshah Governorate with the field of architecture is in the link to the article
https://t.me/Amalgaraa/57
With the function attributed to the head of the construction engineering system organization of Kermanshah province with the field of architecture in the article to the link
https://t.me/Amalgaraa/59
With the function attributed to the head of Kermanshah Province Building Disciplinary Council with the field of architecture, if we sum up about 25,000 square meters of architectural work in 2019 (so far, of course), the engineering service has been registered in the name of these 4 people (of course, I am waiting for their denial or confirmation). .
If we assume that so far in 2019, about 300,000 square meters (it is a very high number) of works B, C, D have been registered in Kermanshah, that means about 8% of the architectural works of Kermanshah have been taken by 4 people so far this year.
If we assume that we have another 500 architects for the remaining 275,000 square meters, it will reach 1,000 jobs each.
The main issue is not just compliance with conflicting interests guidelines, the main issue is how people who were placed in 2 supervisory positions at the same time can supervise their engineering practices as well?
Now add the function attributed to the deputy director of reconstruction of the Department of Roads and Urban Development with the field of civil engineering in the article to the link
https://t.me/Amalgaraa/56
About 1100 square meters + work assigned to the head of the engineering development department of the Kermanshah General Road and Urban Development Department with electrical field in the article to the link
https://t.me/Amalgaraa/61
It has reached 4700 square meters (which I am waiting for the denial or confirmation of these 2 people).
The bigger question is that Mr. Rostamipour inspection of the Ministry of Roads and Urban Development + Mr. Fatemipour the security of the Ministry of Roads and Urban Development are going to do much trouble for the precious engineers of Kermanshah!!! As a rule, based on articles 13 and 15 of the law on promoting administrative health and fighting corruption, they should follow up until the result is achieved.
In addition, these two high officials are aware that another group of the Board of Directors of the Kermanshah Construction Engineering Organization has also received work, and if this is true, then the engineers of Kermanshah should go to Sumaq, unless Mr. Rostamipour + Fatemipour go to the bottom of the line. .
It is not bad that these supervisory officials of the Ministry also want to know about the downfall of the law in Kermanshah.
https://t.me/Amalgaraa/62
Abolfazl Tabarzadi
Member of the Organization of Construction Engineering System of Khuzestan Province
#Kermanshah
The link of Pragmatic Engineers channel
@Amalgaraa