14 important points in building supervision:
1- Supervision of executive operations of the building is a continuous supervision.
2- Supervision starts from the time of issuing the building permit and ends with the issuance of the work completion certificate.
3- The supervisor cannot be the manager of all or part of the building under his supervision, but the supervision of the building by the building designer is unimpeded.
4- The supervisor cannot establish any financial relationship with the owner or act in a way that has interests in the project.
5- The supervision consists of the presence of 4 supervisors from 4 disciplines in the form of collective supervision and not on a rotating or separate basis.
6- Supervising engineers regarding their performance, as the case may be, collectively (in matters that are related to 2 or more disciplines) or individually (in matters that are related to the specialized field of each supervisor’s competence) before the responsible legal authorities and They are accountable.
7- The duties of supervisors have a control aspect: Supervisors are responsible for overseeing the implementation of the building under their supervision in terms of compliance of the building with the specifications contained in the permit and the drawings and technical calculations attached to it, and at the end of the work, the compliance of the implementation of the building with the above documents. to testify
8- All the supervisors of each project are obliged to coordinate with the coordinating supervisor in all matters continuously and to negotiate and collaborate with other supervisors with his information.
9- All the supervisors of each project must visit the project site by agreement before starting the executive operation and check all the features of the property, neighbors and local and urban facilities and make minutes of the meeting.
10- All the supervisors of each project are obliged to control and confirm the balances and locations and make minutes of them according to the coordinating supervisor.
11- All the supervisors of each project from the time of equipping the workshop to the end of the work are obliged to control compliance with health, safety and environmental protection (according to the provisions of Section 12 of the National Building Regulations) in general and within the limits of their specialized competence and to coordinate matters with other supervisors and present Written notices are to the manufacturer and owner.
12- All supervising engineers are obliged to prepare and sign phase reports, and the coordinating supervisor is responsible for submitting and delivering these reports to the legal authorities.
13- All supervising engineers are required to attend the land delivery meeting (with the presence of the owner and builder) and sign the minutes of the meeting.
14- All supervising engineers during the execution period and during the work are gradually obliged to control the construction drawings prepared by the manufacturer at each stage and approve it at the same stage and submit a copy to the construction engineering system organization of the province.