The report of the omission of the omission in the control of the competence and capacity of the natural person of the design company or the supervision (or both) of the construction engineering system organization to the deputy prosecutor of the country

The report of the omission of the omission in the control of the competence and capacity of the natural person of the design company or the supervision (or both) of the construction engineering system organization to the deputy prosecutor of the country

The corruption of formal legal design and supervision companies is in such a way that the capacity of a level 3 engineer is used to obtain the design or supervision (or both) of buildings C and D.

Recently, the issue of renunciation has received the attention of the judiciary.

Failure to control the competence and capacity of a natural person, the design company or the supervision (or both) of the organization of construction engineering system in the provinces of Tehran, Khorasan Razavi, Alborz, Khuzestan, Ardabil, Mazandaran, etc. It was reported to the Deputy Attorney General of the country.
This omission has caused (the control of competence and capacity is part of the description of the duties of the construction engineering system organization of the province) that legal formal companies take illegal advantage of the capacity of a level 3 engineer.

This report will automatically go through the system to the provincial prosecutors for follow-up.

Link to the Public Law System of the General Prosecutor’s Office:
https://dadsetani.ir/?page=report_hoqooq

#Corruption
#Central Council
#Tehran
#Alborz
#Khorasan Razavi
#Khuzestan
#Ardebil
#public_rights
#Suri_Company
#Designing
#supervision

Link to Pragmatic Engineers channel
@Amalgaraa

This post is written by AbolfazlTabarzady