Responsibilities of the coordinating engineer
Monitoring is done collectively and based on relevant expertise by 4 people (real or legal).
In addition to his individual duties, one of the supervisors (civil engineer or architect) is responsible for coordination with other supervisors and correspondence with licensing authorities, etc., and he is given the title of coordinating supervisor.
According to paragraph 1-32 of the second topic of the national regulations, the coordinating supervisor is a natural or legal person with an employment license and supervisory qualification in the field of architecture or civil engineering, who is responsible for coordinating all the supervisors in each building or complex based on the description of the services of engineers in the building fields. or the construction group and submitting work stage reports to the municipality, provincial organization or other relevant authorities.
“The managing director of the company will be responsible for coordinating the legal entity”
Below is a brief description of the duties of the coordinating supervisor:
– The most obvious task of the coordinating supervisor is to establish coordination and communication between other supervisors and the builder/executor, and on the other hand, he is responsible for coordinating and managing control over the quality and quantity of project implementation. Currently, the coordinating supervisor is the representative of other supervisors in relation to the relevant authorities.
– Negotiating with the owner/builder/executive in order to obtain the executive schedule and prepare the minutes of the meeting and notify the other supervisors.
– Coordinating with the owner/builder/executor and other supervisors regarding setting up a four-supervisor contract for each of the parties to the contract, receiving a sealed supervision commitment form from other supervisors, and also checking the employer’s civil liability insurance against the employees according to the necessary clauses.
– Controlling and ensuring the implementation of the building by the competent builder or builders. It should be mentioned that currently, according to the procedure of Tehran municipality, the implementation of projects above 2000 square meters must be done by the competent contractor listed in the permit, and the signing of the operation start sheet (commencement) by the coordinating supervisor must be done after seeing the contractor’s contract. to be After the construction permit is issued and before signing the operation start sheet (the last sheet of the permit), the supervisor and coordinator must visit the property and make sure that no destruction or… has been done. It should be mentioned that after the co-ordinating supervisor signs the start of work sheet, the responsibility of supervising the correct execution of the building demolition is the responsibility of the structure supervisor, but the responsibility of other supervisors also begins at the same time as the construction permit is issued. For example, the responsibility of the electrical supervisor engineer in the demolition operation is more focused on controlling the safety of the electricity meter location in terms of humidity and atmospheric precipitation, and the main responsibility of the mechanical engineer during the demolition includes moving the water meter, collecting gas samples and controlling its location in such a way that in Excavator machines should not be placed in the traffic area, and the heating control in the workers’ rooms (especially in the cold seasons of the year) from the beginning of demolition to the completion of construction operations should be controlled by the supervisor of mechanical installations.
– Signing the operation start sheet and receiving a copy of it after the seal and scanning of the electronic services office.
– Receiving an original copy (stamped with the designer’s seal) of all architectural, structural, electrical and mechanical plans from the owner/builder/executor and preparing periodic meeting minutes. (This does not negate the continuous presence of other supervisors in the workshop). Continuous and continuous communication with other supervisors and informing them to attend the workshop when necessary and holding coordinated meetings to sign the work start sheet in coordination with other supervisors.