#Parking_exemptions in the #seven_principles:

1. Buildings located on expressways with a width of 45 meters or more and do not have access to car parking spaces.

2. The buildings are located at a distance of 100 meters from the intersection of streets with a width of 20 meters and more, both crossings are more than 20 meters and do not have access to the place of cars.

3. The building is located in a place where entering the parking lot requires the cutting of old trees that the municipality has not given permission to cut.

4⃣ In passages less than 4 meters, if a citizen claims to provide parking and the parking is provided and practically usable, the municipality can accept the parking.

5. The building is located on a road that is technically not possible to build a parking lot due to the high slope.

6 ⃣ If the condition and form of the building land is such that it is not technically possible to construct a parking lot at the level of the floors.

7⃣ Being on the edge of the square and up to 20 meters away from it.

Deficit of commercial parking:

1 ⃣ If the main use of the land is commercial, one-third per permit and one-second if not

2. If the main use of the land is non-commercial, up to 50 meters, 25 meters of parking deficit and more than 50 meters, equivalent to half of the infrastructure.

A few points about parking regulations:

1. The minimum height of the parking lot is 2.40 meters and the maximum is 3 meters.

2. If the number of units exceeds the rule, one 25-meter parking space for each unit.
It is required and other exemptions and conditions of the plan will not be valid.

3. In order to change the number of units, provision of parking is mandatory and the municipality does not have the right to agree to segregation without provision of parking or convert parking deficit into a fine.

4. Due to the fact that the commission votes to close and seal in accordance with Note 1 and Clause 24 of Article 55 regarding the change of uses, therefore the parking deficit caused by the change of uses is not sent to the commission.

5. To transfer the parking lot to the basement, the area of ​​the arena must be at least 200 meters and the width of the adjacent passage must be more than 6 meters to ensure the turning radius.

6. In the parking layout in the basement, the system assigns 50 square meters to the ramp by default. If it is possible to reduce the ramp size according to the parking layout plan, enter the desired area in the row of the parking ramp.