Response time Mr. Mohammad Hossein Shreka, member of the Board of Directors of Khorasan Razavi Province Organization, do you confirm the authenticity of this letter and construction permit as your engineering services?

Response time. Mr. Mohammad Hossein Shreka, member of the Board of Directors of Razavi Khorasan Province Organization, do you confirm the authenticity of this letter and construction permit as your engineering services?

Let’s leave aside the issue of the inclusion of the board of directors in the conflict of interest guidelines in this matter (Bandal 4, Article 91 of the Executive Regulations). Also, considering the duties of the board of directors in monitoring the good performance of engineering services and prosecuting the offending members, we will leave aside the discussion of holding two positions at the same time, one of which supervises the other, in this article.

The so-called 27 Code Renewal project obtained a building permit in 2008 and its municipal permit was extended (or renewed) again in 2008. That is, something like 9 years. In these 9 years, there have been changes in the national building regulations. Therefore, if this project goes to engineering again, a new plan must be designed for it, because the previously designed plan is not in accordance with the new national building regulations (Bandalf 1, Article 91).

This is the question that Mr. Shreka, a member of the board of directors of the construction engineering system organization of Khorasan Razavi province, has designed a new map for this project! The observers saw the new map!

#conflict_of_interests
#simultaneous occupation
#Khorasan Razavi

This post is written by sharam80