The actual tariff of the operator
In paragraph 10-17 of topic 2 of the national construction regulations, it is mentioned that the executive fee in terms of contract management is up to 10% of the construction cost, which definitely means the maximum, not the minimum. If it means minimal, it means that the party can close the contract management contract with 100% of the construction cost!!!
But another fundamental issue is the actual tariff of the executive. Currently, the total tariff for design and supervision is 5% of the construction cost (Table 11). Given that:
– The full-time manager is at the head of the building.
– Must perform the duties of 4 fields of civil engineering, architecture, electricity and mechanics.
– He is responsible for safety.
– Preparation of the map is with him.
– Prepare the schedule with him.
Of course, the contractor’s tariff should be higher than the sum of the supervisor’s and designer’s tariff, i.e. 5% of the construction cost, because the designer and supervisor do not have the total of the above parameters for the building.
If you heard that the tariff of the operator in the province is not close to this 10% of the construction cost, then it is possible that this province has a formal operator, although the link is in the article.
https://t.me/Amalgaraa/120
It was mentioned that a formality factor is the current executive directive that needs to be modified.
# presenter
#Majri_Suri
#Tariff
This post is written by AbolfazlTabarzady