With regards,

With regards,
Technical inspection, testing and delivery of electrical installations of buildings and industries

Conducting all pre-delivery tests according to standards
IEC60364-6 & BS7671
Instructions of the Central Council of the Engineering System of the country and topic 22 of the National Building Regulations
Using the latest version of Kyoritsu Multifunction tester from Japan along with the online report of the output of the device with the least human error

According to topic 13 page 37
  Measurement of ground resistance by three-wire method and loop impedance
Continuity test
Eleven residual current circuit breaker (RCD) tests
Insulation resistance test
lightning arrester system test (spd)
Fault loop impedance test
Phase sequence test and voltage drop
Additional main correlation test
Phazonol polarity test
Ambient light intensity test
Matching of As built plans with execution

Muhammad Ali the truth
The designer and senior supervisor of electrical foundation of Khorasan Razavi Engineering System Organization
More than 25 years of useful technical, operational and engineering experience in the oil, gas and construction industries.
International certificate of testing and delivery of electrical installations
Seriri Club’s specialized host
Executive Director of the Specialized Team *Positive Feedback*
Free visit and consultation

  0915-522-2567
  0939-523-2567

This post is written by Haghighat54